Congestion
Exchanges - Physical congestion - Interconnection
Data about the measures put in place by RTE in the event of physical congestion on the network. This includes data generated by changes to the generation and/or load plan which impact the physical flows across the transport network (redispatching) and data to do with cross-border schedules between two TSOs in the direction opposite to the constraining flow (countertrading), as well as the costs borne by RTE in implementing measures to tackle congestion.
Subscribe to API Test API API user guideAvailable Downloads
Related applications
Other APIs with same theme
-
Losses Public Transmission System
Exchanges - Losses
Data about power losses on the electricity transmission grid.
Data about power losses on the electricity transmission grid.
Discover the API -
Cross Zonal Capacity
Market - Auctions
Data about explicit and implicit auctions on the electricity market.
Data about explicit and implicit auctions on the electricity market.
Discover the API -
Physical Flow
Exchanges - Physical flows
Data about physical cross-border schedules detailing electricity flows actually tra...
Data about physical cross-border schedules detailing electricity flows actually transiting across the interconnection lines directly linking countries.
Discover the API -
Ntc
Exchanges - Forecasts
NTC forecast data in MW for various terms (annual, monthly, weekly, intraday and sh...
NTC forecast data in MW for various terms (annual, monthly, weekly, intraday and shorter periods of time if needed).
Discover the API