Exchange Schedule

Exchanges - Long-term - Allocations

Long-term exchange schedules from annual and monthly, daily (D-1) and intra-daily (ID) allocations :
- Exchange schedules representing commercial transits in MW that are the result of each cross-border capacity allocation (long term i.e. annually and monthly, D-1, intraday and real time),
- Authorisations to schedule capacities acquired in the long-term (annual and monthly auctions) before the opening of the intraday market (D-1).

API user guide

Available Downloads

No document to download

Related applications

This API is not attached to any application
Create an application
Web / Server Mobile

Other APIs with same theme

  • Losses Public Transmission System

    Exchanges - Losses

    Data about power losses on the electricity transmission grid.

    Data about power losses on the electricity transmission grid.

    Discover the API
  • Cross Zonal Capacity

    Market - Auctions

    Data about explicit and implicit auctions on the electricity market.

    Data about explicit and implicit auctions on the electricity market.

    Discover the API
  • Congestion

    Exchanges - Physical congestion - Interconnection

    Data about the measures put in place by RTE in the event of physical congestion on ...

    Data about the measures put in place by RTE in the event of physical congestion on the network.

    Discover the API
  • Physical Flow

    Exchanges - Physical flows

    Data about physical cross-border schedules detailing electricity flows actually tra...

    Data about physical cross-border schedules detailing electricity flows actually transiting across the interconnection lines directly linking countries.

    Discover the API